Taconnaz

icon
2019

connected

icon
4.5 MW

power

icon
1 055 m3

maximum turbine flow

icon
10 400

inhabitants

icon
4 800

homes with clean energy

icon
2 700

tons of CO2 avoided per year

overview

The Taconnaz run-of-river hydroelectric power plant has a capacity of 4.5 MW on the Taconnaz torrent in Haute-Savoie (France).

Once completed, the production of the Taconnaz hydroelectric power plant will provide for the annual electricity consumption of approximately 4 800 households, covering nearly 90% of the population of the communes of Chamonix and Les Houches.

While most European glaciers are melting under the effect of global warming, the construction of a hydroelectric power plant at the foot of the Taconnaz glacier helps fight against these dysregulations by producing electricity without CO2 emissions.

Contact Us


Please feel free to get in touch with one of our offices if you need more information.

btn Reach Us